Tenant Improvement Electrical Contractor in Selma, CA
Retail, office, and packing-adjacent commercial build-outs in Selma, wired right and inspected clean.

Commercial Electrical Build-Outs in Selma
Selma sits right on Highway 99, and that location shapes its commercial market. There is highway-facing retail and hospitality, a downtown core along High Street and Second Street, and a strong band of packing, cold storage, and ag service businesses on the edges of town.
Jack Surabian Electric handles tenant improvement electrical for all three. A quick-service restaurant near the freeway needs kitchen circuits, sign power, and exterior lighting. A downtown office needs a clean lighting layout and enough receptacles. An ag service tenant taking a bay in an industrial building needs three-phase circuits and disconnects in the right places.
What they share is a need for accurate scoping. We check the existing service, count what the panel can still support, and put the electrical scope in writing before demolition starts so the budget holds.
Why Selma Tenants Call Us
- Restaurant and retail experience
- Three-phase capability
- Accurate load calculations
- Permitting handled for you
- Written scope before demo
- Licensed and insured
- Schedule kept with your GC
- Labeled, inspection-ready panels
Build-out services
Selma Tenant Improvement Electrical Work
Common build-out scopes we handle for Selma tenants and property owners.
- Highway 99 corridor retail and restaurant build-outs
- Downtown Selma office and storefront renovations
- Industrial bay conversions with three-phase equipment circuits
- Commercial LED lighting installation and controls
- New receptacles, switches, and floor box locations
- Panel upgrades, sub panels, and feeder work
- Sign circuits, canopy lighting, and parking area lighting
- Correcting code issues flagged during inspection


Our Selma Build-Out Process
Step one is the walkthrough and load check. We confirm the service size and voltage, review your equipment list, and tell you plainly whether the existing panel supports the plan or needs to be upgraded.
Step two is rough-in, coordinated with framing and mechanical. Kitchen equipment, refrigeration, and hood controls in particular need their circuits placed before the walls close, because relocating them later means opening finished surfaces.
Step three is trim, testing, and inspection. Fixtures go up, devices get installed and tested, the panel schedule is typed, and we meet the inspector so the permit closes without a second trip.
Building Out in Selma?
Call Jack Surabian Electric for a written electrical scope on your Selma tenant improvement — before the demolition crew arrives.
Questions
Tenant Improvement FAQs for Selma
Planning a Selma build-out?
Call Jack Surabian Electric for a walkthrough, an honest look at the existing service, and a written electrical scope before demolition starts.
