EV Charger Installation in Clovis, CA
Clovis home EV charging installed properly — dedicated circuits, correct breaker sizing, and clean conduit work in the garage.

Level 2 EV Charger Installation in Clovis
Clovis has one of the highest EV adoption rates in the Central Valley, and the neighborhoods where we install most — Harlan Ranch, Loma Vista, Deauville — share a common trait. The homes were built with a 200 amp service, which is plenty of capacity, but the panel arrived nearly full from the builder.
That means the constraint in Clovis is usually breaker space rather than amperage. When there is no room left, we either consolidate with a properly rated tandem arrangement where the panel permits it, or install a small garage sub panel fed from the main service. Either way the charger ends up on a dedicated circuit with nothing else sharing it.
We handle both new construction pre-wire and retrofits, install hardwired chargers and 14-50 receptacles, and pull the City of Clovis permit on every job.
What Clovis Homeowners Get
- Dedicated 240V circuit
- Right-sized breaker
- Neat surface conduit
- Load sharing for two EVs
- Scheduled off-peak charging
- Weather rated outdoor work
- City of Clovis permit
- Written quote up front
Electrical requirements
Clovis Charging Scenarios We Install For
Home charging looks different depending on where the panel sits and how the garage is used. These are the Clovis setups we handle most.
- Attached garage installations with the panel on an adjacent wall — the cleanest and fastest run
- Two-vehicle households needing dual chargers or a load-sharing pair on one circuit
- Panels with adequate amperage but zero free breaker spaces
- Garage sub panels that serve the charger plus shop lighting and tool circuits
- Driveway and carport mounting with weather rated enclosures and outdoor rated conduit
- New construction and remodel pre-wiring so the circuit is in place before drywall
- Upgrading from a 120 volt trickle charge setup to true Level 2 speeds


Our Clovis EV Charger Installation Process
We start with the panel schedule and a load calculation. In Clovis the service rating is rarely the problem, so most of the assessment is about space, breaker compatibility, and whether the existing bus can accept the breaker your charger requires.
Next we plan the mounting position around how you actually park. A charger placed for the cable to reach a Model Y's driver-side port will not reach an F-150 Lightning's front port from the same wall. We measure with your vehicle in the garage rather than assuming.
The install itself is conduit, conductors, breaker, charger, and commissioning. We set the charger's amperage to match the circuit, verify it under load, configure scheduled charging against off-peak rates, and complete the permit inspection.
Level 2 Charging in Your Clovis Garage
Whether you are adding your first EV or a second, call Jack Surabian Electric. We will check your Clovis panel for space, size the circuit correctly, and give you a firm price before we start.
Questions
EV Charger Installation FAQs for Clovis
Ready for Level 2 charging in Clovis?
Call Jack Surabian Electric for a load calculation, a correctly sized dedicated circuit, and a permitted, inspected EV charger installation.
